Case studies
energy recovery

1 x Turbine

5.8MM kWh/yr | 14 years ROI

Tanner Project

The Amador Tanner Project transformed a water distribution system into a renewable energy source, utilizing a hydroelectric station to generate power and provide savings, showcasing the viability of integrating renewable energy in utility services.

Case study >

1 x Turbine

1MM kWh/yr | 8.4 years ROI

Sandhill Project

The San Gabriel Sandhill Project converted a water pressure reduction site into a renewable energy source, generating over 1 million kWh annually, contributing to sustainability and cost savings.

Case study >

Your Content Goes Here

Your Content Goes Here

Your Content Goes Here

Deploying worldwide

NLine Energy Map