Case studies
energy recovery


1 x Turbine
5.8MM kWh/yr | 14 years ROI
Tanner Project
The Amador Tanner Project transformed a water distribution system into a renewable energy source, utilizing a hydroelectric station to generate power and provide savings, showcasing the viability of integrating renewable energy in utility services.
Case study >

1 x Turbine
1MM kWh/yr | 8.4 years ROI
Sandhill Project
The San Gabriel Sandhill Project converted a water pressure reduction site into a renewable energy source, generating over 1 million kWh annually, contributing to sustainability and cost savings.
Case study >Your Content Goes Here
Your Content Goes HereYour Content Goes Here
Deploying worldwide
